Plenty of progress at Pannells Ash Barn – a luxury holiday let renovation
On: September 22, 2012   |   By: Pannells Ash   |   Under: luxury holiday let, Pannells Ash Barn, renovation   |   Comments: Comments are off
Yesterday, the roof started to receive its first layer of insulation. It’s all precut to size and slots between the diagonal rafters.

The holes to house the pads for the mezzanine floor were prepared before the concrete was transported in and poured.

The pad holes cut in and prepared.
Then a much easier task of
lining the holes.

With the pad holes ready, it was time to fill:

The result looked like a herd of very large dairy cows had walked through the barn leaving their trade mark behind!